Twin Oaks Power One

State
Texas
County
Robertson
City
Bremond
Postal Code
76629
Location
13065 Plant Road

Bremond, Texas, boasts of about four power plants that serve a population of about 3986 citizens. Among the famous power plants in the area is the Twin Oaks Power One. Twin Oaks Power One transforms wind energy into bulk electrical power and supplies it to the Robertson County electrical system, which then distributes it to consumers in Texas.

Details about the Twin Oaks Power One

The Twin Oaks Power One is an Onshore Wind Turbine that operates a Wind Electric Power Generation plant. Twin Oaks Power One is operated and run by the Texas Wind Energy Partners Llc.

It has a consistent operational capacity of 75 MW throughout the year no matter the season, during summer or winter, produced by just one generating unit, which usually uses a primary wind fuel (WND).

Texas is accessible to the Bremond citizens who can freely engage the management on critical issues regarding power supply in the region. Among the issues that this establishment handles include:

  • The Texas Power Plant Types in Robertson County
  • Electric businesses and the Bremond Power Authority.
  • Issues concerning pollution and renewable energy.
  • Production of electrical energy.
  • Tours of power plants and hours of operation.

Twin Oaks Power One Contact Information

The Twin Oaks Power One is easily accessible to the public through several avenues. If you have any concerns about the above issues, you can contact the Twin Oaks Power One by emailing this address, Twin Oaks Power One; 13065 Plant Road, Bremond Texas 76629, or physically visiting the same address. For more information, you can call them or check out this website.

Directions

Refer the map below to find the driving directions.